Wind turbines are the largest wind-operated machines to date. Because of the complexity of these great machines and their dependence on consistent, strong wind, turbines are never constructed simply because someone wills it; there must be a power demand to warrant their construction. After years of research and planning, turbines are built to supplement an existing power grid.
Like their wind engine predecessors, turbines components and
spare parts can be mass produced. Specially designed
facilities have been constructed to accommodate the oversized
turbine parts. Because the United States is among the
latest nations to utilize wind power, nearly all of the
utility-scale wind turbines are manufactured in Europe or Asia
by companies that have been in the business for decades.
Initial shipments of turbines to the United States were slowed
by a lack of equipment. Only a handful of ports had the
proper lifting equipment installed for unloading the large
turbine components. Over the years, more ports have been
fit to accommodate turbines shipments, and because of the
increasing demand for spare turbine parts, some manufacturers
have opened new plants and warehouses in the United States.
The tower determines the height of the turbine. The
first turbines, like wind engines, were mounted atop open
lattice-framed towers available in different heights. Over
the years, as turbines became larger in diameter, the lattice
frames were replaced by cylindrical steel towers that are
fabricated in sections (they have to be, else they would be too
large to ship!). These tower sections can be bolted
together to achieve the proper height.
The tower contains no operating machinery of any kind. In
fact, the inside of a modern wind turbine tower is hollow aside
from cables (to bring power to the controllers within the
nacelle and to run generated electricity from the nacelle to the
transformer on the ground) and a long ladder (allowing
maintenance personnel to reach the nacelle).

Because wind turbines evolved from wind engines, they are all
generally built with self-luffing technology to keep the sails
facing the wind. On smaller systems, this means a simple
vane attached to the gearbox. On utility turbines, gearbox
and luffing equipment is house within the nacelle—the equivalent
of a cap on a custom windmill. Because it rests on a live
curb ring, the nacelle can pivot 360 degrees in the event the
wind changes direction (see Wind Turbine Operation).
The nacelle is usually constructed in the form of a rectangular
prism and made of steel. The nacelle must be built strong
enough to accommodate the gears and large electrical components
within. Many nacelles open with a hinged hood—almost like
a giant toolbox—so that the major components can easily be
installed or replaced over time. The exterior of the
nacelle doubles as advertising space for manufacturers to
display their logo.

Shown below are the various sail designs employed to generate
electricity. The first wind turbines were designed from
annular-sailed wind engines. Over the years, both
individuals and companies have experimented with sail design for
both horizontal and vertical axis turbines.
The sails of a wind turbine are unlike those of any other wind
machine. The large, fiberglass sails of utility turbines
are specially shaped and tested to turn in light winds and
withstand strong gales. The sails can be pivoted upon
their own axis to expose more or less surface area to the wind,
depending on the speed.

Long before wind turbines (or wind farms) are built, field
tests are performed on areas where turbines may be built.
These tests measure the speed and direction of the wind at
varying heights to determine whether there is sufficient wind to
sustain a turbine. More wind turbines are located in rural
areas or along a coast because the wind is constant and there
are fewer obstructions. This data is often collected by an
anemometer, a device with cup-like “sails” rotating upon a
vertical axis.
Other factors, such as temperature fluctuation, ground
conditions, interference from surroundings, and anticipated
energy usage are also considered when choosing a turbine style
and location. In the Midwest, turbines are made of
fiberglass that can withstand seasonal temperature changes and
fierce winds from severe storms.
Once an area is deemed suitable for turbine construction, planners meet with government agencies at the local and state levels seeking permits to allow construction. Public hearings are held so that landowners may offer their opinions about the project. If approved, surveyors will identify where turbine towers, transformers, electric lines, and service roads will be.
Engineers work at manufacturing the turbines and design how
to integrate a wind farm with the existing power grid.
Meanwhile, the turbine sails, tower, and nacelle are
manufactured at their respective plants, oftentimes overseas.
The tower and nacelle are constructed in [large] pieces to be
assembled later; the sails, however, must be cast as a single,
continuous piece of fiberglass.
To make turbines compatible with the local power grid, the
electrical components are usually made in the United States.
The generator and ground equipment that will regulate both
turbine operation and the flow of electricity
Once the pieces of each turbine are completed, they are
shipped to the United States by barge. In the early 2000s
when wind turbine construction began increasing, receiving docks
at ports had to be equipped with special handling equipment to
unload the large sails.
The turbine pieces are then transported by train and truck to a
distribution warehouse. There, the turbine pieces,
fasteners, electrical components, cables, and tools are stored
and partially assembled until construction can begin.
During this time, technicians will be hired and trained to
maintain the turbines.
Gravel service roads are laid out on the land so that
heavy construction equipment can reach each turbine site.
Earth boring machines create the deep holes that will be filled
with concrete to create the footings of each tower. When
the concrete cures, underground cables and utility boxes are
installed that will regulate the turbine; these lines will run
to a central control center for the entire wind farm facility.
The tower is constructed in sections, each held together by
large stainless steel bolts. The electrical equipment is
installed in the nacelle, which is then lifted onto the tower
with a large crane. Each of the three sails is
attached to the hub on the ground, and then the entire assembly
is lifted and bolted into place. Once all of the
components are attached and thoroughly tested, operation of the
turbine can begin.